Four ways an FAI becomes an emergency

Almost nobody plans for the FAI to be the bottleneck. Then it is. With production hovering over the CMM saying their part is right, management hovering over the CMM asking when it will be done, and shipping hovering over the CMM asking if they can ship it, that's when experience comes into play.

WHAT GETS DELIVERED

Results the package can absorb

THE LANE

Support and measurement, approval stays yours

The measurements, the program, and the formatted results come from the service. Acceptance and approval of the first article stay with your quality system, which is exactly how the standard assigns responsibility. No outside programmer should be signing off your first articles, and this one is structured deliberately so that line never blurs.

Project programming beyond the FAI: see the full CMM programming services page

RATES

The same published rates, sized for single FAIs

$125 per hour. It doesn't matter if you have 1 part or 100, The CMM Programmer can handle your complete package: your site, your equipment, your parts, your timeline. The day rate covers the bigger packages, published in full on the pricing page.

FAQ

Frequently asked questions

What does first article inspection support actually include?
First article inspection support covers building the CMM program to the ballooned print, running the measurements, and delivering results keyed to the balloon numbers in a format your quality system can drop into the FAI package, so the documentation side starts organized instead of reverse-engineered.
Can an outside programmer do an AS9102 FAI for my shop?
An outside programmer can build the program, measure the parts, and deliver the characteristic results an AS9102 package needs, while acceptance and approval of the first article stays with your quality system, which is how the standard assigns responsibility and how this service is deliberately structured.
How fast can FAI support get on-site when a deadline is close?
FAI support can often be on your floor within the week, and when the package has a hard due date, the visit gets planned backward from that date, with the schedule stated honestly up front, so the first article is measured, documented, and in your quality team's hands on time.
Does FAI support cover PPAP dimensional results too?
PPAP work is covered the same way as AS9102, with the CMM program built to the ballooned print and the dimensional results delivered in a format that drops into the PPAP package, which matters to shops feeding both aerospace and automotive customers from the same floor.
What happens when the FAI fails a characteristic?
A failed characteristic during an FAI run gets flagged immediately with the measured value, the method, and a quick sanity check of the program's approach to that feature, so your team can tell a true nonconformance from a measurement artifact before anyone makes a CNC tool offset or work offset on questionable data.